Pre-Functional Check Sheet
The gate before energization - installation, torque, insulation, grounding and protection settings, signed off per equipment tag.
SPARKY QC
Electrical QA/QC
sparkyqc.com
Project
Job No.
Client
Sheet ____ of ____
Check No.
Date
Procedure Ref
System / Subsystem
Equipment Tag
Description
Installation Complete
Yes
No
N/A
Terminations Torqued to Spec
Yes
No
N/A
Insulation Resistance Tested and Accepted
Yes
No
N/A
Grounding and Bonding Verified
Yes
No
N/A
Protection Settings Applied
Yes
No
N/A
Labels and Arc Flash Warnings Installed
Yes
No
N/A
Temporary Leads and Grounds Removed
Yes
No
N/A
Area Clear and Barricaded
Yes
No
N/A
Open Punch Items
Result
Pass
Fail
Conditional
Punch Item Ref
Checked By
Checked by / Date
Witnessed by / Date
Client / Owner Rep / Date